Overview

WHERE IS THE STUDY AREA LOCATED?

The Study Area runs from just south of Columbia Street to about 1,000 feet north of Mills Avenue and includes several key intersections - Washington Street, 1st Street, Garfield Avenue, Baca Avenue, and Mills Avenue.  This part of Grand Avenue is an important commercial corridor, home to many local businesses, including restaurants, retail shops, gas stations, and hotels.  Also present within the vicinity are residential neighborhoods, local schools, New Mexico Highlands University, and area hospitals, all contributing to the area's vitality.

Rural segment of Grand Ave north of Mills Ave.

Figure 1. Study Area Map (click to enlarge image).

Rural segment of Grand Ave north of Mills Ave.

Figure 1. Study Area Map (click to enlarge image).

WHY IS THIS STUDY NEEDED?

The goal of this study is to understand the current transportation needs along Grand Avenue and identify improvements that enhance safety and mobility for all users.  This alignment study will evaluate existing conditions and develop recommended solutions to address several key challenges, including:

  • Aging and deteriorating roadway and drainage infrastructure
  • Safety concerns at major intersections
  • Inadequate pedestrian and bicycle facilities

These improvements aim to create a safer, more efficient, and accessible corridor for the entire community.

WHERE ARE WE IN THE PROCESS?

The study team is currently gathering data on existing conditions and developing some preliminary improvement alternatives. A first public meeting was held in February of 2026, along with a meeting with public officials and other stakeholders. In September of 2026, the team plans to present the findings to the community in an open house format  to gather feedback and help refine the proposed options. Once public input is incorporated and the alternatives will be further analyzed, a prioritization plan will be created. This plan will guide phased implementation as funding becomes available.

Study Area Map, CN 4101960

Figure 1. Study Area Map (click to enlarge image).

Project Timeline

complete
complete

Spring 2025

  • Collect existing condition data

complete
complete

Summer/Fall 2025

  • Develop the purpose and need for the study
  • Identify and develop preliminary alternatives to consider

complete
complete

Winter 2026

  • Stakeholder meetings and Public Meetinng
  • Gather input from community
  • Prepare draft Phase A document

live
live

Spring/Summer 2026

  • Evaluate alternatives in detail
  • Stakeholder meetings and Open House
  • Gather feedback community

planned
planned

Fall 2026 / Spring 2027

  • Identify a preferred alternative(s)
  • Stakeholder and public engagement
  • Prepare and finalize Phase 1-A/B Study