US 180 Corridor Phase III Improvements - CN 1101840/1101843
US 180 Corridor Phase III Improvements - CN 1101840/1101843
The New Mexico Department of Transportation (NMDOT) recently completed a study was completed for the US 180 corridor between Deming and Bayard in September 2021. The corridor was divided into three phases for design development and construction. Currently, Phase 1 from Bayard to Hurley is in construction, and Phases 2 and 3 are in design development.
US 180 from Luna Co. Line to Deming from MP 142.6 to MP 161.21 (18.61 mile)
Visit the full US 180 Corridor Phase III Improvements - Grant County project page
- County
- Grant County
- NMDOT District
- District 1
- Current phase
- Study and Design
Control Number - CN 1101840 (Design)
CN 1101843 (Phase III Construction)
Documents
Download the US 180 Corridor Study
View the 4-Lane Alternative graphic.
View the Enhanced 2-Lane Alternative graphic.
View the Existing Highway: Airport Road to Cold Water Creek Bridge graphic.
View the Existing Highway: Bayard to Airport Road graphic.
View the Existing Highway: Cold Water Creek Bridge to Dwyer Road graphic.
View the Existing Highway: Dwyer Road to Keeler Road graphic.
View the Intersection Layout Concepts graphic.
view the project area map
View the Super 2 Alternative graphic.