WHAT IS THE PURPOSE OF THE STUDY?

The purpose of this study is to identify ways to improve roadway and roadside safety, reduce crashes, address roadway and drainage infrastructure deficiencies, and enhance connectivity along the corridor.

Corridor Needs Identified:

  • Roadway geometry and pavement condition deficiencies
  • Crossing drainage structure deficiencies
  • Safety and access control improvements
  • Pedestrian, bicycle, and transit deficiencies

US 64 is a critical connection between Tres Piedras and Taos, providing access to communities, businesses, public lands, and cultural and historic resources. The corridor passes through developed and rural areas, Bureau of Land Management lands, private properties, and Taos Pueblo tribal lands, and includes nationally significant features such as the Rio Grande Gorge Bridge and historic transportation corridors.

WHERE ARE WE IN THE PROCESS AND WHAT ARE THE NEXT STEPS?

The study team has evaluated roadway and drainage conditions and has developed some preliminary improvement alternatives. The Study Team will be hosting an Open House on October 8th from 4-7pm at the Taos Civic Center. Your involvement will help us understand local needs, review concerns early, and shape the future construction that genuinely supports everyone who travels the corridor.  

Project Timeline

complete
complete

2023 to 2025

  • Collect Existing Condition Data
  • Analyze Data Collected
  • Develop Existing Conditions Report

complete
complete

Winter/Spring 2026

  • Develop Preliminary Alternatives
  • Develop DRAFT Phase A Report

live
live

Summer/Fall 2026

  • Host Public Meeting (June 2026
  • Conduct Detailed Analysis of Alternatives
  • Identify Preferred Alternative(s)
  • Develop Draft Phase B Report
  • Host Open House - October 2026

planned
planned

Winter 2026

  • Finalize Phase A/B Study Report and Develop Prioritization Plan
  • Initiate Preliminary Design for Phase 1

planned
planned

Summer 2027

  • Develop Design Plans for Phase 1 Improvements